Building Progress - The walls are fitting into place!

January 26, 2010

The first walls are going up as we speak – weather permitting by early next week every wall on the facility will be tilted up and in place.  The roof structure will start to be tied in next week and will take about 20 working days and then we are off to the races on the interior.  It is moving quick and getting very exciting.

High Voltage Walls 012810

Stay tuned for more updates!


We have concrete!

December 16, 2009

The new building is picking up momentum.  The picture below shows the control shop and office space prior to the concrete floor being poured over this area on 12/10/09.
Dowell Baskets 12/09/09
Dowell baskets will add extra support and strength to our 7" concrete floor and only about 10% of all industrial buildings take this extra step and expense.  Our production area floor throughout the facility will be one of the premier industrial floors in the valley which will bode well for the company for years to come as it is one of the most important features of a building.
 

KEI Breaks Ground on New State of the Art Facility - "High Voltage"

November 3, 2009

KEI is excited to announce that we broke ground on our new facility which will be completed Summer 2010!

KEI Ground Breaking 11/03/09

Don Anderson,  President, CEO   KEI Ground Breaking 11/03/09
 

(Pictured L-R: Chris Lynch, Steve Osborn, Jim

   Everson, Don Anderson, Steve Kain, Duane Keller, Greg Annick, Danny Morone)

 
KEI Ground Breaking 11/03/09
 

   (Pictured L-R: Greg Annick, Mary Sullivan, Jennifer  Novak, Don Anderson, TJ Kern, Duane Keller)

Don Anderson, President & CEO
 

 


Keller Electrical Industries Announces Project - "High Voltage"

August 17, 2009

Our new 105,292 sq.ft. Repair, Manufacturing & Distribution Facility:

Rendering

Superior Central Phoenix Location & Highway Access

1881 East University Drive, Phoenix, AZ 85034

(Map our new location)
  • 8.7 Acres Located in Sky Harbor Business Park
  • Convenient Access to I-10 & I-17 Freeways

State-of-the-Art Construction

  • 270 KW of Solar Power Generation
  • Water Conservation Recycling System to save water and improve

     life of rooftop Evaporation Coolers

Superior Industrial Bridge Crane Capacities

  • 30 Ton Main Crane Capacity
  • 20 Ton Primary and 10 Ton Auxiliary
  • 56 Foot Bridge Coverage Area
  • 35 Ft. Exterior Extension for Ease of Accessibility
  • Three Interior 10 Ton Cranes
  • One Interior 7.5 Ton Crane

Jib Cranes for Efficient Material Handling

  • Five 3 Ton Cranes in Motor Repair Facility
  • 5 Ton Crane in Winding Clean Room
  • 3 Ton Crane in Control Manufacturing Facility
  • 2 Ton Crane in Control Manufacturing Facility
Photograph

Drive-In and Dock High Receiving and Shipping Capabilities

Paint Booth - Enclosed 13'x10'x20' - Handles all Special Coating Requirements

1500 KVA Test Stand with Voltage Available at 13.8 KV

  • AC Output Phase Balance Compensation +/- 1%
  • 600 Volt DC Testing Capabilities
  • DC & AC Metering
  • Wattmeter, Optical Speed Measurement and Eight Channel RTF Temp. Measurement and Display
  • Outstanding Reporting and Data Collection Tools
Rendering

1450 HP Water Cooled Dynamometer

  • Calibrated Load Cell, Precision Control and Instrument Package

250 HP Water Cooled Dynamometer

New VPI System - 96" Diameter, 96" Length

  • Totally Automated Controls and Instrumentation
  • Capacitance Probe and Meter for Epoxy Saturation 

Clean Room for Winding Operation

  • Protects Winding from Outside Contaminants

Industrial Curing and Burn-Off Ovens

  • 1,200 Cubic Foot Curing Oven - 10'x10'x12'
  • 288 Cubic Foot Curing Oven - 6'x 6'x8'
  • 640 Cubic Foot Burn-off Oven - 8'x10'x 8'